Guidance · 4 min

What information is needed for a Part G water calculation?

The fitting data that turns a provisional sanitaryware schedule into a defensible calculation.

Fittings and appliances

Provide the proposed WC flush volumes, tap and shower flow rates, bath capacities and relevant appliance information for each dwelling specification. Manufacturer data is preferable where products are selected.

Use actual performance data

Style names or catalogue images do not establish water use. Product data should identify the performance value used in the calculation and any operating modes that apply.

If products are not selected

A preliminary calculation can use a coordinated performance specification. This gives the designer or client clear limits to use when selecting fittings later.

Resolve selectively

If the first calculation does not achieve the applicable target, test focused changes. Reducing every fitting indiscriminately can compromise usability without being necessary.

Project-specific advice

Building Regulations guidance and assessment methods can change, and transitional provisions may apply. Confirm the correct route for the particular project rather than relying on a general article.

Official references

Approved Document L Approved Document O Approved Document F Approved Document G Standard Assessment Procedure

Start a conversation

Need this applied to a live project?

Upload the drawings and a few project details. We will review what is needed and confirm the scope before work begins.

Get a quote